Send us the findings. We map each one to the document that has to change, tell you what you can keep, and rebuild the rest — revised free for 90 days until it passes. T&Cs apply
A rejected document pack is rarely a writing problem. It is usually a pack that was built to look compliant rather than to survive a review — generic risk content, controls without owners, references to documents that do not exist, and no document control underneath any of it.
Send us the findings. We map every one to the document that has to change, tell you what you can keep, and rebuild the rest — then it is revised free for 90 days until it passes.
Four steps. No hourly billing, no rebuilding what already works.
The rejection letter, the gap list, or the reviewer’s marked-up comments — whatever you have. Plus the pack you submitted and the principal’s contractor management standard if you hold a copy.
Every finding is traced to the specific document and section that has to change. Vague findings are translated into concrete actions, and where the intent is genuinely unclear we tell you what to ask the reviewer.
We tell you which of your documents are usable as-is. You pay to fix the ones that failed, not to replace a pack. Scope and price confirmed, usually within two business days.
Ten business days from scope confirmation for a full pack. If findings come back on documents we built, we close them out at no cost.
The findings change wording between sites. The underlying causes rarely do.
The last one is the gap we see most often. Most providers can write the safety half — see what a full pack includes.
A pre-submission review is $199 ex GST, credited in full against any document suite you order within 60 days. Considerably cheaper than fixing a rejection, and it does not put your mobilisation date at risk.
We read your pack against the standard your client reviews to, then send you a document-by-document findings list within 3 business days, and a fixed price for anything that needs rework. The $199 is credited in full against any document suite you order within 60 days.
We read your pack against the contractor management standard you will actually be reviewed against, not a general benchmark.
Document control, revision history, review dates, sign-off, numbering, site-specific controls, role mapping, register completeness, branding and maintenance inputs.
The output is a document-by-document action list. If most of your pack is fine, we will say so.
Findings closed before submission do not delay mobilisation, and do not put a second round of review in front of your client.
Booking the $199 pre-submission review? Tell us what your pack covers and when you need to submit. Had a pack knocked back? Paste or describe what your client came back with. Either way you get a fixed price, usually within two business days.
Fixed price · No obligation · Scope confirmed within 2 business days
Send us the findings list or rejection letter. We map every finding to the document that has to change, tell you which of your existing documents are usable as-is, and rebuild only what needs rebuilding. Scope and a fixed price are usually confirmed within two business days, and a Site-Ready pack is delivered in 10 business days from that point; larger suites are scheduled at scope confirmation.
Almost never. Most rejections concentrate in a handful of documents — typically the management plan, the risk register and a subset of SWMS. We will tell you honestly what you can keep. You are not paying us to rewrite documents that already pass.
We can support the resubmission and prepare the response to findings, but we work through you rather than around you. It is your contract and your relationship with the principal.
Yes. A pre-submission review is $199 ex GST, credited in full against any document suite you order within 60 days. Findings come back within 3 business days. It checks your pack against the principal’s contractor management standard and the ten audit-ready criteria before the reviewer sees it.
The pre-submission review is $199 ex GST, credited in full against any document suite you order within 60 days. Findings come back within 3 business days. A remediation is then quoted on scope after that review, because the price depends entirely on how many documents actually need rework. The review establishes that, then we quote one fixed price for the rebuild. See suites and pricing.
Run the free check before you send us anything. Twelve questions, an instant traffic-light score, and a gap list that will tell you roughly how much of your pack actually needs rebuilding.